On the Critical Path

On the Critical Path (1971)


  • Genre: Documentary
  • Release Date: 1971-01-01
  • User Rating: 7/10 from 1 ratings
  • Runtime: 0h 22min
  • Language: English
  • Production Company: ONF | NFB
  • Production Country: Canada
star 7/10
From 1 Ratings

Summary

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path Trailer

Is On the Critical Path on Netflix?

Is On the Critical Path on Netflix? Unfortunately the movie On the Critical Path is not yet available on Netflix.

Production Dennis Sawyer Producer
Crew Kenneth McCready Script
Sound Bernard Bordeleau Sound Editor

keyboard_arrow_up